Shirt Pocket Discussions  
    Home netTunes launchTunes SuperDuper! Buy Now Support Discussions About Shirt Pocket    

Go Back   Shirt Pocket Discussions > SuperDuper! > General

 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 08-20-2010, 02:27 AM
Dewdman42 Dewdman42 is offline
Registered User
 
Join Date: Apr 2009
Posts: 62
Two scheduled backups back to back

How is it possible to have SuperDuper kicked off by a schedule and another backup that is also schedule to start after the other one finishes? Obviously I can space them apart timewise and hope its enough time, but I'm wondering if there is a better way to have two backup jobs linked to each other some how so that one follows the other always. Or that being said, is there any problem if two instances of SuperDuper fire off jobs overlapping each other?
Reply With Quote
 


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Scheduled SmartUpdate with Time Machine arthurlewis General 5 04-10-2009 04:30 PM
Saving backups? Necessary for scheduled backps? gcoghill General 2 12-09-2007 11:43 PM
Scheduled Backups Don't Run Drdul General 3 08-07-2007 06:45 AM
Scheduled backups failing using WD MyBook USB HD timslim General 3 05-31-2007 08:22 AM
Feature request: "Run scheduled backups NOW" option ChicagoLarry General 1 09-11-2006 12:29 PM


All times are GMT -4. The time now is 04:02 PM.


Powered by vBulletin® Version 3.8.9
Copyright ©2000 - 2024, vBulletin Solutions, Inc.