![]() |
|||||||||||
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
#1
|
|||
|
|||
Advanced scheduling
I have two backup drives, one offsite that I rotate weekly. I've been using SuperDuper for a little over a month and for the most part it's great. I didn't think I had a particularly strange setup, but the use of cron for SuperDuper's scheduling system is driving me up the wall
![]() After futzing with 2 scheduled copies for the last month or so I've finally worked out that the only way to make this work is use 4 schedules. 2 primary backup jobs scheduled for most of the week, and another 2 that adjust for the differences between weekdays and the numbered weeks used by the crontab. To give you an idea of what I'm doing, I backup at 11pm daily and swap drives on Friday. For March, my schedules are now: Backup to drive 1 on the first and third weeks, except friday Backup to drive 1 on the second and fourth weeks, only friday Backup to drive 2 on the second and fourth weeks, except friday Backup to drive 2 on the first and third weeks, only friday (if you think about it in cron terms - this is the only way to make the first backup 1-6, 14-20, 28-31 and the second 7-13, 21-28). I've had to set a calendar reminder to adjust these schedules on the first of each month, April will probably require a 50/50 split between the two because the 1st is a Tuesday. Are there any plans for a better scheduler? As well as proper weekly schedules, I'd love a "start but wait for drive" option on my mum's laptop. She finds it a hassle to remember that her backup drive must be plugged in at a certain time otherwise SD complains and the backup doesn't happen. [edit]Just noticed this post suggesting iCal for scheduling. I can possibly solve my scheduling woes with that, but it'd be better if SD could handle it for me ![]() Last edited by Spyder; 03-14-2008 at 12:18 PM. |
Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
Thread Tools | |
Display Modes | Rate This Thread |
|
|
![]() |
||||
Thread | Thread Starter | Forum | Replies | Last Post |
"Smarter" Scheduling | toonetown | General | 2 | 07-20-2007 11:02 AM |
Failed scheduling | Kermo | General | 2 | 07-18-2007 03:49 AM |
Smart Scheduling? | gryphonent | General | 5 | 04-12-2006 08:04 AM |
scheduling | bharath | General | 5 | 12-08-2005 01:59 PM |
Scheduling not working? | kbradnam | General | 10 | 12-01-2005 04:05 PM |