View Single Post
  #6  
Old 02-16-2008, 11:17 PM
rithban rithban is offline
Registered User
 
Join Date: Jul 2007
Posts: 16
I've played with this some. If I use 7-bit ASCII, then the scheduling works. If I don't, the scheduling doesn't work. Is this a bug or OS X limitation?

If from the "Scheduled Copies" window, I press "Copy Now", it works with or without the 7-bit ASCII limitation. It only seems to be the scheduled run that has trouble.

Thank you for the tip. I'd rather be able to type something short rather than "Backup Day Before Yesterday 2". For the time being I'll put up with it just so the darned scheduled backups run.
Reply With Quote