Two scheduled backups back to back

How is it possible to have SuperDuper kicked off by a schedule and another backup that is also schedule to start after the other one finishes? Obviously I can space them apart timewise and hope its enough time, but I'm wondering if there is a better way to have two backup jobs linked to each other some how so that one follows the other always. Or that being said, is there any problem if two instances of SuperDuper fire off jobs overlapping each other?