View Single Post
  #3  
Old 08-17-2009, 10:20 AM
steve z steve z is offline
Registered User
 
Join Date: Aug 2009
Posts: 5
well, maybe a "skip next scheduled" button, or some way to turn off a scheduled back up without re-editing the schedule which would require us to remember to re-re-edit the schedule back on later. This is because I know something went wrong in the system and the back up was scheduled before I could fix it and I did not want to move the wrong thing into my next system backup, hence a "skip next" or similar behavior was needed.
And what is the easiest way to "run now" a particular saved back up scheme?
Reply With Quote