View Single Post
  #3  
Old 04-14-2020, 09:11 AM
Dan Lester Dan Lester is offline
Registered User
 
Join Date: Nov 2008
Posts: 178
Yes, the schedule isn't actually changing. In fact, a NEW, second scheduled run is somehow being created. Yesterday, somehow, a second run was scheduled at 9:30pm (on the same days as my 2:30am run). So my schedule list now includes a second backup run for that disk. That second run is identified as #2.

Well, my point is that I'm not changing anything. I don't even open the program until I'm trying to figure out what happened. So I'm certainly not looking at my schedules when the new run is scheduled.

I do not have backup-on-connect checked.
Reply With Quote