Shirt Pocket Discussions

Shirt Pocket Discussions (https://www.shirt-pocket.com/forums/index.php)
-   General (https://www.shirt-pocket.com/forums/forumdisplay.php?f=6)
-   -   Scheduled Custom Script Uses Wrong Script? (https://www.shirt-pocket.com/forums/showthread.php?t=904)

Dasman 12-08-2005 01:50 PM

Scheduled Custom Script Uses Wrong Script?
 
I created a Custom Script doing a Smart Update of the Documents folder only, tested it and it worked fine. I then Scheduled it to run at a specified time. When it ran, the script it used was the Standard Scripts/BackUp - all files, and not the Custom Script I thought I had scheduled to run. When I looked at the log, it called for the BackUp - all files script. Why is the wrong script being used? Also, although the custom script ran at the correct time, when I looked at the schedule, it said 9:30 pm, even though it ran at 12:00, the time I wanted. Is the 9:30 setting a default that appears even when the scheduled time is something else?

dnanian 12-08-2005 01:55 PM

It sounds like you're confusing the "main window", Dasman, with the scheduled item. As the manual explains, the scheduled copy is completely independent of the settings in the main window: once scheduled, further changes to the main window doesn't change something that's already scheduled.

So, if you want to change various things about it other than the date/time of the run, delete the one that's there already, set things up in the main window, and then click "Schedule". That'll add a new copy to the list.


All times are GMT -4. The time now is 12:47 AM.

Powered by vBulletin® Version 3.8.9
Copyright ©2000 - 2024, vBulletin Solutions, Inc.