Quote:
Originally Posted by dnanian
Have you reviewed the Scheduling section of the User's Guide, Eric? You need to set a wake event, using the Energy Saver preference pane, for one minute before the scheduled copy time for it to run w/sleep.
|
I did not, but I sort of figured as much. Still, I claim "one stop shopping" would be the better way if it's not a huge problem on your (the developer's) end.
My recollection is fuzzy and may be off, but I thought one time S/D did try to perform scheduled backup after the fact (backup wasn't done on time for some unknown reason).